Case Study: Kaiser Hospital Dry-Up

For Kaiser Hospital, heavy rains led to saturated soils. This shut down site access and put the project behind schedule. PRS stepped in with a fast, cost effective solution. We applied cement stabilizing Dry-Up to the subgrade in just one day.

This reduced trucking into and out of the project by 40:1.

The result?

A stable, all-weather foundation that kept the projects moving without delays and extra costs.